Safe Air begins engineering on Afren project
September 5, 2014Safe Air Technology is pleased to announce the award of the Afren project to Safe Air for the “Well head #2” Platform of the coast of Africa. The equipment will be serving the “E-House and Tool Room Buildings” for the platform. At this time our engineering team lead by Mr. Leif Wismar, P.E., C.E.M. are in the stages of providing approval drawings for a custom explosion proof offshore severe duty system that will provide 100% redundant operation in both cooling and room pressure. The systems will be controlled by a DDC system (Direct Digital Control) and provide external readings and alarm to a remote location. Safe air Technology design allows for simple integration between our system and the Fire and Gas Control Panel. Some of the special features of the systems that are being provide are as follows.
I.All Engineering work completed by Safe Air Technology Professional Engineering Team
II.All Metal work Shall be 316 Type L Stainless Steel Design
III.All Coils Shall be Copper Tube Copper Fin Severe Duty Wall Design and Coated for Marine Duty Environments. All Coating tested and Certified
IV. Heating Elements Shall be Stainless Steel Fin Tubular Design
V.Operational Controls DDC system (Direct Digital Control) designed by Safe Air Technology to 100% comply with client specifications
VI.Project includes FAT (Factory Acceptance Testing and Certification)
VII.Project Includes Onsite Engineering for Startup and Training
Above are just a few of the features that are included with this project. The equipment will be 100% delivered ON TIME for our client. Once the project is completed we will be moving forward with Phase 2. Safe Air Technology would like to thank its clients for the opportunity to continue to work with you. We look forward to providing the Three Keys to Success: Quality, pricing and On Time Delivery